Pierre-Laporte Bridge closes nights of Aug 26–31 for pavement repairs
Two of three lanes closing for road resurfacing; expect congestion and plan detours via Highway 73.
Sources · Quebec Nouvelles
The day's top stories, food & events — every morning at 7. Unsubscribe anytime.
The Pierre-Laporte Bridge will undergo partial nighttime closures August 26–31 to repair the roadway surface.
Two of three lanes will close in alternating directions each night. Northbound closures run Wednesday August 26, 9 p.m. to 5 a.m. Thursday; Thursday August 27, 10 p.m. to 5 a.m. Friday; and Friday August 28, 10 p.m. to 7 a.m. Saturday. Southbound closures are Saturday August 29, 10 p.m. to 7 a.m. Sunday; Sunday August 30, 10 p.m. to 5 a.m. Monday; and Monday August 31, 9 p.m. to 5 a.m. Tuesday.
Exit 132 (Boulevard Champlain) will close completely during northbound work Wednesday and Thursday. During southbound work Saturday and Sunday, access to the bridge from Boulevard Champlain will close completely. Detour routes are available via Highway 73, Avenue de Rochebelle, and Boulevard Hochelaga.
Speed limits drop to 70 km/h during repairs. The Ministry of Transport warns that congestion is expected and recommends drivers allow extra time. Work is dependent on favourable weather; if conditions worsen, dates and times may shift. Check Quebec 511 or download the Quebec 511 mobile app for real-time updates before travelling to the bridge area.
What is the total cost of the pavement repair project?
Why was August chosen for these repairs instead of an off-peak season?
We'll update this story as answers emerge.
The facts
When does the Pierre-Laporte Bridge close for repairs?
The Pierre-Laporte Bridge closes partially at night from August 26–31, 2026. Northbound lanes close Wednesday August 26 through Friday August 28, and southbound lanes close Saturday August 29 through Monday August 31.
How many lanes close during the repairs?
Two of three lanes close each night on the Pierre-Laporte Bridge, with closures alternating between northbound and southbound directions.
What is the speed limit during repairs?
The speed limit drops to 70 km/h on the Pierre-Laporte Bridge during the repair work.
How can drivers get real-time updates?
Drivers can check Quebec 511 or download the Quebec 511 mobile app for real-time updates about conditions on the Pierre-Laporte Bridge.